Skip to content
Contact
  • Projects
  • Expertise
    • Civic
    • Residential
    • Conservation
    • Masterplan
    • Our services
  • People
  • About
    • Accreditations
    • Sustainability
  • Latest
  • Projects
  • Expertise
    • Civic
    • Residential
    • Conservation
    • Masterplan
    • Our services
  • People
  • About
    • Accreditations
    • Sustainability
  • Latest

Wallyford

Back to projects

Project information

Client:
East Lothian Council
Location:
Albert Place, Wallyford
Size:
60 homes
Awards:

Project overview

PROJECT DESCRIPTION

This key brownfield site, located in the centre of Wallyford, was formerly home to the local primary school and was identified by East Lothian Council as a priority site for affordable housing. The project aims to deliver much‑needed homes in response to the affordable housing crisis declared by the Council in November 2024.

The approved proposals will deliver 60 new homes, all for social rent, which will be retained and managed by the Council. The development provides a mix of one to four bedroom flats and houses, carefully designed to respond directly to identified local housing need.

Following demolition of the former school and its relocation to a modern facility, the site had become fenced off and presented a barrier to local pedestrian movement. A key challenge was therefore to stitch the new development into the existing residential fabric, reconnecting surrounding streets and footpaths to improve permeability, accessibility, and community integration for both new and existing residents.

The project also had to respond sensitively to significant level changes across the 3 acre site.

DESIGN APPROACH

The proposals create a new residential street that gently winds into the heart of the development, culminating in a central pocket park that forms a focal point for the community. The layout is carefully designed to knit into the surrounding network of footpaths associated with the former school site. Connections to the High Street, the existing public park, and the nearby community church are strengthened, improving movement and legibility throughout the area.

Early pre‑application engagement with the Planning team supported constructive design development, with a focus on retaining and enhancing green space, increasing planting and tree coverage, greening streets, and ensuring all homes enjoy a pleasant outlook. Sustainable urban drainage requirements are fully met on site.

All landscape design has been carefully considered and developed in collaboration with SLR Landscape.

Homes are arranged to enjoy views of green space, with well‑proportioned windows providing high levels of daylight and outlook. Passive surveillance has been a key consideration throughout, supported by input from the Police Architectural Liaison Officer to enhance neighbourhood safety.

ACCESSIBILITY, MOVEMENT & COMMUNITY

Accessibility is integral to the development and includes:

  • Six wheelchair‑accessible homes
  • Dedicated disabled parking spaces
  • Level access to all properties

 

The scheme prioritises walking and cycling for both residents and the wider community. Car parking is provided on a 1:1 basis, with all spaces EV ready. New pedestrian footpath connections integrate the site with the surrounding neighbourhood, improving permeability and encouraging active travel.

As part of the planning process, two successful community engagement events were held at the Wallyford Learning Campus prior to submission of the planning application.

LANDSCAPE, ECOLOGY & SUSTAINABILITY

Working closely with Council landscape and ecology officers, the proposals extend and connect new landscape measures with existing surrounding green infrastructure. This approach enhances biodiversity and creates improved habitats for wildlife. The landscape strategy includes new tree planting, wildflower meadows, and varied planting, strengthening habitats for mammals and pollinators while creating high‑quality outdoor spaces for residents.

The layout has been developed in accordance with the six qualities of successful places set out in NPF4 Policy 14: Healthy, Pleasant, Connected, Distinctive, Sustainable, and Adaptable.

All homes will be constructed to high‑performance standards, with significant use of modern off‑site manufactured closed‑panel systems. This approach improves thermal efficiency, reduces on‑site waste, shortens construction times, and supports earlier delivery.

The development will be net zero, incorporating photovoltaic panels, air‑source heat pumps, and exhaust‑air technologies, with no reliance on mains gas.

COLLABORATION

East Lothian Council is a founding partner of the South East Regional Delivery Alliance (SE‑RDA), which brings together local authorities, Registered Social Landlords, and industry partners to collaboratively deliver new affordable housing.

Smith Scott Mullan and CCG (Scotland) Ltd have been involved from an early stage and are working together on several projects as part of this programme.

Further information is available at:
www.se-rda.org.uk

Sectors

  • Residential

Keywords

  • Affordable Housing

Services provided

Design
Planning
Delivery

Key people

Rick McCluggage

RICK McCLUGGAGE
Architect and Director

Steven Cochrane

Senior Architect

Ross Benham

Architect

Jill Fleming

Architectural Technologist

Related posts

Similar projects

View all projects
Edinburgh Home Demonstrator
  • Housing, Landscape
Various
Edinburgh Social Bite Village
  • Community, Housing, Landscape
Granton, Edinburgh
Heather Mill
  • Affordable Housing, Heritage, Housing
Selkirk
Get in touch
To find out more about working with us, get in touch today.
Contact us
Smith Scott Mullan
10 Rutland Square
Edinburgh EH1 2AS
0131 555 1414
Email us
  • Privacy policy
  • Cookie Policy (UK)
  • Privacy policy
  • Cookie Policy (UK)
© Copyright - Smith Scott Mullan 2026. Smith Scott Mullan + Associates Ltd trading as Smith Scott Mullan. Registered in Scotland No. 149821. Registered office as above.
Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}